The project included reclamation of the eroded sections of the Coastline to a distance approx. 110m from the Centre Line of the existing runway, construction of New Shore Protection in the form of a Stone Revetment along the remainder of the coastline, existing Groynes repaired, enhanced and extended as necessary, plus the existing beach area was regenerated.