LOCATION |
Abu Dhabi, UAE |
Construction of 290Lm Long 5 Span Twin Bridge with Pre-stressed Concrete voided Deck Slab and 300Lm Long 6 Span Single Bridge with Pre-stressed Concrete voided Deck Slab. The work involved Structural Concrete works, Piling works, Widening, Reconstruction of Approach Roads, 55,000 Sqm Earth Retaining Wall Panels, Storm Water Drainage Network and Associated Utilities Relocation and Protection of Existing Services.
|