Expertise

HILALCO is a full-service general construction and project development company with the resources and expertise to handle projects of any size, location or complexity.

Earth Works

HILALCO has carried out massive Earthmoving and Site Grading activities and has a proven track record in Early Development Projects for Site Preparation, Highway Construction, Community, and Township Development, Sea Port and Airport Development, Industrial Development and in Leisure & Entertainment Development projects.

Roads & Highways

HILALCO has undertaken many prestigious and demanding Road Works Contracts during the last Two decades and has completed more than 1000 Km lanes of Roads in the Emirate of Abu Dhabi, which includes the initial section of Abu Dhabi to Dubai Highway, Main roads in Abu Dhabi City, Al Ain City and Western region rural desert areas and several internal roads in high profile areas which requires significant traffic management and execution skills.

Utilities & Infrastructure

HILALCO has executed Infrastructure Projects for Urban Township Development since 1993. HILALCO has developed its infrastructure and utilities network capabilities to meet the large scale of urbanization demand that requires efficient delivery of essential water, drainage and sewerage services.

Bridges, Tunnels & Interchanges

HILALCO's "Special" category classification to build bridges places it in the forefront in constructing bridges in the UAE as well as numerous Underpasses and Flyovers that have been completed with in house resources for the Government of Abu Dhabi.

Building & Industrial Works

HILALCO’s capability is not limited to roads and Infrastructure works. HILALCO’s building expertise encompasses construction of hotels, residential developments, industrial facilities, Substations and civil works for Industrial buildings.

General & Special Civil Works

HILALCO posses the capabilities to execute special Civil Works like Heavy Equipment Foundations, Water intake Structures, Culverts Crossing, Border Security Fences, Rip Rap Works, Embankment Works, Duct Chambers and any specialized Civil Works.

Airports

Airport projects symbolize the challenges and demands facing every contractor, owner and design professionals. HILALCO meet the challenges of airport projects and dealt with them in a careful, sensitive, comprehensive and compassionate manner, guiding the projects to a successful completion.

Marine Works

Marine Construction work is yet another field of experience of HILALCO as evidenced in Abu Dhabi Breakwater road to Marina Mall, Al Raha Beach Hotel, Delma Jetty and artificial islands for power distribution pylons in the Umm Al Nar channel.

MEP Works

HILALCO diversified into MEP works in 1998 and since then has obtained vast experience in the various MEP field.

Irrigation & Soft Landscaping Works

HILALCO's expertise goes beyond urban infrastructure. The company has completed unique projects to build theme parks, resorts and wildlife sanctuaries, creating a perfect balance between aesthetic elegance and architectural proficiency. HILALCO can take the vision of clients and make a reality.

Hardscaping & Theming Works

HILALCO’s expertise in Hardscaping includes nearly 10 years involvement in the Iconic Development of Al Ain Zoo Safari Park and World Desert which consist of hard and soft landscape development of 900 hectares of land.

About us

HILALCO - Hilal Bil Badi & Partners Contracting Company (WLL) has been active in multidisciplinary Construction Projects in Abu Dhabi since 1996.

Major Projects

By nature Civil Work is geographically diverse and extremely demanding. This has made us versatile civil builders equally in busy city environments as well as in remote areas.

List of Projects

PROJECT NAME AD 539 : Design and Build Apron Expansion and Taxiways Widening at Al Ain International Airport
LOCATION Al Ain, UAE

Expansion of Apron and Widening of Taxiways to accommodate 2 Code “F” Aircraft (B747-800) for VVIP movement including Relocation of affected Services, AGL, Edge Lighting and High Mast Lighting System and Grading for Smooth Surface Water Drainage.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
NAME OF CONSULTANT Abu Dhabi Airports Company (ADAC)
CONTRACT AMOUNT IN MN DHS 12.84
TYPE OF CONTRACT Main Contract
START DATE 07/11/2016
END DATE 30/04/2017

PROJECT NAME AD 529 : Asphalt Works for Zirku Airport Runway Extension at Zirku Island
LOCATION Zirku Island, UAE

Laying of 2500 m3 Aggregate Base Course, 15875 Tons of Asphalt for Extension to the Existing Runway and Milling & Overlaying (5 cm) of 40000 sqm Existing Runway at Zirku Island. (Materials provided by the Subcontractor)

NAME OF CLIENT Abu Dhabi Marine Operating Company (ADMA OPCO)
MAIN CONTRACTOR NAME Archirodon Construction (Overseas) Co. S.A.
CONTRACT AMOUNT IN MN DHS 2.79
TYPE OF CONTRACT Sub Contract
START DATE 01/02/2016
END DATE 01/04/2016

PROJECT NAME AD 523 : Design & Build of Code C Parking Layover at Abu Dhabi International Airport – Contract No. ADAC 034 2014
LOCATION Abu Dhabi, UAE

Airside works for Design & Build of Code C Parking Layover at Abu Dhabi International Airport (Approx. 18,000 m2). Supply & Laying: Subgrade, Subbase, Bituminous Base Course and Wearing Course, Road Marking. Supply & Installation of Traffic Signs and Mobile Fire Extinguishers.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
NAME OF CONSULTANT Abu Dhabi Airports Company (ADAC)
CONTRACT AMOUNT IN MN DHS 5.99
TYPE OF CONTRACT Main Contract
START DATE 17/09/2014
END DATE 05/11/2014

PROJECT NAME AD 510 : AUH.06.11.0436 Southside Perimeter Security Gates & Parking Enhancement Construction Works
LOCATION Abu Dhabi, UAE

Security Gates & Parking Enhancement Construction Works Construction of 3 No. Security Guard Houses, Covered Car Parking, Fencing, Structural Canopies and Shed Structures for Traffic Controlling, CCTV and Access Control System, Traffic Management Control System at Gates and Parking Areas at 4 No Locations.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
NAME OF CONSULTANT Abu Dhabi Airports Company (ADAC)
CONTRACT AMOUNT IN MN DHS 39.22
TYPE OF CONTRACT Main Contract
START DATE 03/09/2013
END DATE 25/08/2014

PROJECT NAME AD 505 : South Airfield Development and Rehabilitation Construction – Package 2
LOCATION Abu Dhabi, UAE

Construction of Taxiway and Apron Slab at Abu Dhabi International Airport Construction of Taxiway Extension Network (2.5km Main Taxiways and connecting taxiways), 100,000 Sqm of 380mm Concrete Apron Slabs for Cargo area including Airfield Ground Lighting, Electrical Power Distribution with Frequency Convertors, Communication Cabling, Fire Fighting Network, Storm Water Drainage. Main Jet Fuel System with 20km Jet Fuel Pipelines and Fuel Hydrants, Various Auxiliary Buildings Airside Roads, AOA Fencing and Jet Blast Fencing, Cavity Filling and Remediation Works on the existing Taxiway “F”.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
NAME OF CONSULTANT NACO/Stanley/Diwi
CONTRACT AMOUNT IN MN DHS 582.80
TYPE OF CONTRACT Main Contract
START DATE 23/07/2013
END DATE 24/03/2017

PROJECT NAME AD 502 : Pavement Works for Sweihan Air Base, CMW-10009-C005
LOCATION Abu Dhabi, UAE

Pavement Construction Works for Sweihan Air Base Runway Construction and completion of Wet Mix and Asphalt Pavement Works for the Runway and Taxiways at Sweihan Air Base.

NAME OF CLIENT Command of Military Works(CMW)
MAIN CONTRACTOR NAME Al Sahraa General Transport & Maintenance (ASG)
NAME OF CONSULTANT Al Sahraa General Transport & Maintenance (ASG)
CONTRACT AMOUNT IN MN DHS 81.91
TYPE OF CONTRACT Sub Contract
START DATE 01/09/2012
END DATE 31/01/2014

PROJECT NAME AD 499 : Terminal 3 (T3) Early Site Works Construction – Contract No. AUH.06.12.0455
LOCATION Abu Dhabi, UAE

Early Site Works Construction for Bus Gate Building at Abu Dhabi International Airport Construction of AOA Fence for Modification of existing Airside Operation Area and Hard Standings. Cut, Fill and Compact Ground Formation for Construction of Bus Gate Building and New Transfer Baggage Facilities (TBF) Extend Storm Water Drainage Pipeline Network and connect to Storm Water Drainage Mains. Relocation of existing Underground Utilities within the Site, and Lining of Retention Basin.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
NAME OF CONSULTANT Ghafari Associates LLC
CONTRACT AMOUNT IN MN DHS 28.86
TYPE OF CONTRACT Main Contract
START DATE 01/08/2012
END DATE 15/08/2013

PROJECT NAME AD 482 : Contract CT294/ADAC092 – Mubadala Strata Infrastructure Phase 1 for Al Ain International Airport
LOCATION Abu Dhabi, UAE

Construction of Infrastructure works for Mubadala Strata. Demolition of Existing Structure & Site Clearance, Construction of Infrastructure comprising Roads, Earthwork, Road Signs and Markings, Sewerage Network, Potable Water Network, Storm Water Drainage Network, Electrical Relocation Work, Street Lighting and Telecommunication Duct Works.

NAME OF CLIENT Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)
NAME OF CONSULTANT Mouchel Middle East Ltd
CONTRACT AMOUNT IN MN DHS 47.34
TYPE OF CONTRACT Main Contract
START DATE 20/03/2010
END DATE 25/09/2011

PROJECT NAME AD 478 : T1-T3 Business Park Grading, Roads & Infrastructure Contract No. WBS: 1.13.1.2.
LOCATION Abu Dhabi, UAE

Roads and Infrastructure Work for T3 Etihad Terminal at Abu Dhabi International Airport. Construction of Utility Distribution Networks comprising Electrical Power Network, Potable Water Supply Network, Chilled Water Network, Firefighting and Irrigation Water Distribution, Sanitary Sewer Network, Storm Water Drainage Network with Retention Pond, Communications System Distribution, as well as Construction of New Overflow Car Park, Curve Road, Widening of the Main Entrance Road and The Business Park Road Network.

NAME OF CLIENT Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)
NAME OF CONSULTANT Stanley Consultants Inc.
CONTRACT AMOUNT IN MN DHS 154.72
TYPE OF CONTRACT Main Contract
START DATE 26/06/2009
END DATE 05/08/2010

PROJECT NAME AD 471 : Design and Build Apron and Incidental Works at Sir Bani Yas Island Airport – Contract # CT205/ADAC039
LOCATION Abu Dhabi, UAE

Design and Construction of Apron and Incidental Works at Sir Bani Yas Island Airport. Construction of 32,000 Sqm Apron with Two Taxiways and all other incidental Works as well as 8.5km Airport Security Fence Installation.

NAME OF CLIENT Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)
NAME OF CONSULTANT Stanley Consultants and Halcrow International Partnership
CONTRACT AMOUNT IN MN DHS 37.00
TYPE OF CONTRACT Main Contract
START DATE 16/02/2009
END DATE 15/03/2010

PROJECT NAME AD 456 : Etihad Interim Terminal – Abu Dhabi International Airport- Earth Works and Road Works
LOCATION Abu Dhabi, UAE

Construction of Earthworks and Road Works in Etihad Interim Terminal at Abu Dhabi International Airport. Cut/Fill 150,000 Cum Earthwork for Terminal Building, Access Road, Air Side Road Work, Asphalt Road Network and Passenger Drop off Zone, External Works and Utilities Network.

NAME OF CLIENT Abu Dhabi Airports Company (ADAC)
MAIN CONTRACTOR Al Habtoor-Murray & Roberts JV
NAME OF CONSULTANT Parsons International Ltd
CONTRACT AMOUNT IN MN DHS 49.50
TYPE OF CONTRACT Sub Contract
START DATE 04/11/2006
END DATE 31/05/2009

PROJECT NAME AD 443 : Amiri Flight Package 1 Advance Earth Works
LOCATION Abu Dhabi, UAE

Extension of Aprons at Amiri Flight 800 m2 Cut/Fill Formation of 450,000 m3, General Imported Fill 250,000 m3, Minor Fencing and Access Roads.

NAME OF CLIENT Amiri Flight
NAME OF CONSULTANT Halcrow International
CONTRACT AMOUNT IN MN DHS 11.81
TYPE OF CONTRACT Main Contract
START DATE 07/10/2002
END DATE 30/03/2003

PROJECT NAME AD 435 : Filling at Al Dhafrah air Base Zone 1B Contract MW-241-2001
LOCATION Abu Dhabi, UAE

Earthwork for Al Dhafrah Airbase
3.25 Million Cum Volume of General Filling and Earthwork for Formation of Runway & Taxiways at Al Dhafrah Military Airbase.

NAME OF CLIENT Directorate of Military Works
NAME OF CONSULTANT Stanley Consultants
CONTRACT AMOUNT IN MN DHS 29.95
TYPE OF CONTRACT Main Contract
START DATE 06/05/2002
END DATE 25/12/2002