Project
|
Name of Project
|
Name of Client
|
Name of consultant
|
Type of work
|
Contract Amount in MNDhs
|
Commencement
Completion
|
1. AD403 |
Internal Roads for 300
Low Cost Houses in Wadi Flaie |
Public Works Dept. |
Freeman Fox
International |
Township development Roads, Footpaths, Utilities, Sewer Networks
and Sewage Treatment Plant complex. |
113.97 |
22/07/1994 |
2. AD405 |
Internal Roads for 200
Low Cost Houses in Al Quo'A |
Public Works Dept. |
Freeman Fox
International |
Township development Roads, Footpaths, Utilities, Sewer Networks
and Sewage Treatment Plant complex. |
87.91 |
16/09/1995 |
3. AD409 |
Internal Roads for 100
Low Cost Houses in Al Waqan |
Public Works Dept. |
Freeman Fox
International |
Township development Roads, Footpaths, Utilities, Sewer Networks
and Sewage Treatment Plant complex. |
76.36 |
21/08/1997 |
4. AD410 |
Aluminum Fence at Baniyas Area. |
Public Works Dept. Abu
Dhabi |
Ital consult |
Construction of 10 km Aluminum Fence |
10.06 |
10/09/1998 |
5. AD414 |
Breakwater
Developments Contract No 987 |
Abu Dhabi Municipality |
DeLeuw
Cather International Ltd |
Phase-I Infrastructure for Abu Dhabi Breakwater including 4-Lane
Dual Carriageway, 3-Span Bridge, Car Parks, Utilities Networks and Street
Lighting. |
76.84 |
15/04/2000 |
6. AD419 |
Polyethylene Project Technimont/ Borouge
Petrochemical Project Ruwais |
Al Habtoor
Engg Murray Roberts JV (For Technimont/ADNOC) |
Technimont
/ADNOC |
General Earthworks and Landscaping, Hard standings and
Asphalt road work and Interlock Tile Works |
19.00 |
07/10/2000 |
7. AD418 |
Chain Link Fence for
Boundary Line Contract No MW/2215 |
Directorate of
Military Works |
Directorate of
Military Works |
Supply and installation of 3.5m high Security Fence from Al Ain to Umm Zumool along Oman
UAE Border |
43.52 |
17/09/2000 |
8. AD431 |
Internal Roads for 200
Low Cost Houses at Al Shawamekh |
Works Department |
Frederic R. Harris |
Dual Carriageway 4 km Internal Roads 14 km Sewer Network 16 km
with one Sewer Pumping Station, Power, Water and Storm Water Distribution
Networks and Street Lighting. |
71.90 |
01/09/2001 |
9. AD448 |
Conference Palace
Hotel External Works, Package BP 14A & B |
Arabian Construction
Co. |
Turner Construction
International |
External works for all Utilities of Conference Palace Hotel
(Sanitary Drainage, Storm Water, Irrigation, Fire Fighting and Water Supply)
with related Parkings and Road works. |
37.00 |
16/06/2003 |
10. AD447 |
Urgent Water works for
Abu Dhabi - Contract D-1912 |
Abu Dhabi Distribution
Company (ADDC) |
ADDC |
Urgent Water Network construction and Rectification works
in Abu Dhabi Island |
1.50 |
08/06/2003 |
11. AD455 |
Abu Dhabi Golf Club
Landscaping and Road Works |
Tourism Development
& Investment Company |
Frederic R. Harris |
Construction of temporary Access Road, Infrastructure
works inside & outside the Club Grounds and other Civil works, which
include Landscaping, Street Lighting & Storm Drainage. |
5.25 |
21/10/2006 |
12. AD462 |
Breakwater Development,
Marine Village No. 1 - Roads and Parking Contract # 987/1/1 |
Department of |
De Leuw,
Cather International Ltd. |
Construction of Roads, Parking, Earthworks, Drainage system,
Water & Irrigation works, Lighting & Electrical distribution works
and all related Civil and Infrastructure works. |
20.65 |
23/09/2007 |
13. AD468 |
Sea Port and Airport
Terminals Infrastructure Works |
Tourism Development
& Investment Company |
Mott Macdonald |
Action Impact Building Infrastructure Works (Water, Power
and Sewer connections and Access Roads). |
4.00 |
10/09/2008 |
14. AD467 |
Installation of 33 KM
Fencing and Construction of Access Roads. |
Tourism Development
and Investment Company (TDIC) |
Cansult
Maunsell |
Installation of 33 KM Fencing and Construction of Access Roads. |
8.20 |
20/09/2008 |
15. AD461 |
P058 - Sir Bani Yas Hotel Development.Package: C06 - Hotel Refurbishment: External
Works |
Tourism Development and
Investment Company (TDIC) |
Project Manager:
TDIC-Leighton , and Engineer: NORR Group |
Construction of Roads, Hard Standings, Landscaping and all other
related Civil Works and Infrastructure utilities. Construction of additional |
295.00 |
12/08/2007 |
16. AD474 |
Park Rotana Mixed Use Development, Abu Dhabi - Sector E-48,
Plot No. 367 External Drainage Works |
Terna
S.A. |
-- |
Preparation of Working Drawings, Supply of Road Traffic
Barriers, Excavation of Trenches, Sheet Piling, Dewatering, Construction of
Manholes and Chambers, Laying of Pipes and Backfilling |
3.60 |
18/04/2009 |
17. AD480 |
Miscellaneous Works at
Sir Bani Yas Island |
Tourism Development
and Investment Company (TDIC) / Anantara |
Tourism Development and Investment Company (TDIC) / Anantara |
Miscellaneous works at Sir Bani Yas Hotel Refurbishment of HVAC System, Installation of
Standby Generator and Rectification of Electrical Works and sundry Builder's
Works. |
11.42 |
27/09/2009 |
18. AD480D |
Sir Bani Yas Island Priority
Projects Enabling Works |
Tourism Development
and Investment Company (TDIC) |
Turner &
Townsend International Ltd |
Enabling works for Construction of Savannah and Flamingo Lodges,
Conference Centre and Equestrian Centre, earthworks and utilities,
Infrastructure works for Savannah and Flamingo Lodges. |
25.79 |
24/02/2010 |
19. AD478 |
Expansion of the |
Supervision Committee
for the Expansion of the |
Stanley Consultants
Inc. |
Utility Distribution Networks: Electric power supply , potable
water supply & distribution, Fire, Water, chilled water and Irrigation
water distribution, sanitary sewer network, storm water network anddetention pond, communications sytem
distribution cables, as well as construction of New Car Park curve road,
widening of entrance road and business park road network. |
45.50 |
20/03/2010 |
20. AD488A |
Sir Bani Yas Island Priority
Projects Equestrian Centre and Savannah Lodge Water Connections |
Tourism Development
& Investment Company (TDIC) |
Parsons
International Ltd |
Supply and Laying of 1600 LM 110 mm dia
HDPE Line and 900 LM of 300 mm dia D.I. Pipeline
including Fittings, Valves, Chambers and connections to the existing lines at
Equestrian Centre and Savannah Lodges. |
3.46 |
24/10/2010 |
21. AD477 |
Contract No. P-088:
Works Package C03 - Saadiyat Beach Residential
Infrastructure (SB12 through SB 18) and Edge Protection works (SB 18, 20, 21
and 22) |
Tourism Development
and Investment Company (TDIC) |
Parsons International
Ltd |
Infrastructure works of Gravity Sewers, Potable water pipelines
and Storm water drainage lines.Construction of Roads,Lighting, Signage, Telecommunication network,
Electrical works, etc. |
205.79 |
14/06/2009 |
22. AD472 |
Al Ain
Wildlife Park & Resort Project - Design and Construction of Site Wide
Infrastructure |
Zoo & Aquarium
Public Institution in Al Ain |
CH2M Hill |
Design and Construction Services for the Site Wide (65 Million
m2), Infrastructure for the Al Ain Wildlife Park
& Resort Project.Earthwork, Roads, Utilities,
Landscaping, Theming and general Civil Works. |
500.00 |
March 2009 |
23. AD484 |
Addendum No. 3A for
Original Agreement # WRM-PTC-INF-147-08 - Improvement, Development, Upgrading
and Maintenance of Infrastructure facilities including Minhaj
and Strategic Projects - Liwa City East |
Department of
Municipal Affairs - Western Region Municipality |
Euroestudio |
Improvement, Development, Upgrading and Maintenance of
Infrastructure facilities, Roads and various Civil Works at Liwa City |
94.80 |
01/06/2010 |
24. AD486 |
MWD - Motor World
Development Project, Infrastructure Works Phase 1 |
Aldar
Properties PJSC |
AECOM Middle
East Ltd |
Construction of Infrastructure works for Motor World Development
Project Phase 1 including Road works, Water Supply Network, Street Lighting,
Power Network, Storm Water & Drainage Network, Sewerage Network,
Irrigation Network and Telecommunication Duct Works. |
60 |
09/08/2010 |
25. AD483 |
Development of Zayed Sports City Sector W-57, Abu Dhabi, U.A.E. Package
1, Infrastructure Works for Rihan Heights |
Mubadala
CapitaLand Real Estate LLC |
WS Atkins &
Partners |
Infrastructure Utilities and Road Works for Rihan
Heights Buildings and Re-routing of HV Cable Network and Package Substation
Works |
27.80 |
01/05/2010 |
26. AD485 |
Design and Build
Contract of Main Entry, Parking, Linear Park and Periphery Themed Retaining
Wall |
Zoo & Aquarium Public
Institution in Al Ain |
Hyder Consulting |
Design & Build Main Entrance Road works, Landscaping
features & Hardscapings and Public Car Parks as
well as Earth Retaining Walls and Mock Rock Cladding of approximately 4 km in
length and Landscaping & Irrigation system and Theming for the East
Perimeter and other Public Areas |
159.00 |
07/06/2010 |
27. AD469 |
Police and Civil Defence Facility - Sir Bani Yas Island |
Tourism Development
and Investment Company (TDIC) |
Cansult
Maunsell |
Foundation/Bases for 7 Nos. Residential, 1 No. Office
Prefab, General Earthworks, Hardscaping and Road
works & Utilities reticulation for Compound area. |
6.20 |
15/10/2008 |
28. AD481 |
Al Falah
Community Development Infrastructure Works -Village 1 |
Aldar
Properties PJSC |
Fluor Mideast
Ltd |
Construction of Infrastructure works for Al Falah
Community Development Village 1 including Road works, Water Supply Network,
Street Lighting, Power Network, Storm Water & Drainage Network, Sewerage
Network, Irrigation Network, 1 No. Pumping Station and Telecommunication Duct
works. |
418.47 |
01/03/2010 |
29. AD487A |
Eastern Mangrove Project
External Service Connection including D.I. Pipeline with Fire Hydrant |
Brookfield Multiplex |
Hyder Consulting Middle East Ltd |
Eastern Mangrove Project External Water Service Connection
Construction, Erection, Testing, Commissioning and Handing Over. |
8 |
01/11/2010 |
30.
AD420
|
Development
of Breakwater Electrical works in Abu Dhabi – Contract D-00-0150
|
Abu
Dhabi Water & Electricity Authority
|
ADWEA |
Installation of mainly 11kv Cables in the
Hilton area, Abu Dhabi
|
1.14 |
22/08/2000
21/06/2001 |
31.
AD437
|
Water
Supply to Emirates Palace Hotel – Contract No. D-1599
|
Abu
Dhabi Distribution Company (ADDC)
|
ADDC |
Water supply to Emirates Palace Hotel in
Abu Dhabi. Main line D.I. 600mm dia and Branch lines D.I. 300mm dia.
|
1.99 |
30/06/2002
29/04/2003 |
32.
AD487C |
P030
Zayed National Museum – Package C06 : Construction of Remote Service Facility and Main
Building Sub-structure works. |
Al
Habtoor-Murray & Roberts JV |
WSP |
Structural earth works and Drainage works
for Enabling works to Sub Structures |
5.00 |
20/01/2011 20/05/2011 |
33.
AD493 |
Khalifa
Port and Industrial
Zone (KPIZ) Project Contract 1001-290 Industrial Zone Area A - Secondary
Infrastructure Phase 1, Package 1 |
Abu
Dhabi Ports Company (ADPC) |
International
Bechtel Co. Ltd |
Construction of Secondary Infrastructure
Package 1 for Development at Khalifa Port
Industrial Zone Area 'A'. Major and Minor Road Network, Electrical Network
and Street Lighting, Sewer and Storm Water Network including Lifting
Stations, Potable Water and Irrigation Network and Hardscaping. |
298.00 |
17/10/2011 15/01/2014 |
34.
AD494 |
Ruwais
Housing Complex Expansion, Phase III
– External Infrastructure works for Packages 10 & 12 Project No.
7001 |
Abu
Dhabi National Oil Company (ADNOC) |
ADNOC |
Package 10: Construction of Infrastructure
works for Ruwais Shopping Mall comprising Car Parks
and Landscaping including water feature.
Road works, potable water, electrical, sanitary and storm water, fire fighting and irrigation networks.
Package 12: Design and construction of
Infrastructure works for Ruwais Married Staff Accommo-dation facilities comprising roads, potable
water, sanitary and storm water drainage network, irrigation network with
pumping station, 11KV power network, street lighting and tele-communication
network including Tie-in with existing system. |
77.00 |
14/12/2011 28/12/2013 |
35.
AD495 |
Abu
Dhabi Breakwater Development – Roads and Infrastructure works |
National
Investment Corporation |
Parsons
International Ltd |
Construction of Roads and Utilities
Infrastructure around Marina Mall at Breakwater. About 3km of road network, conversion
of existing 4 round-abouts to signalized
intersections, widening of existing roads and improvement of entrances/exits
storm water drainage, potable water works, electrical distribution works,
street lighting, telecommunication network system, sewerage network upgrading
and irrigation works. |
73.01 |
03/01/2012 31/08/2014 |
36.
AD496 |
Grandstand
Temporary Marking and Landscaping works |
Abu
Dhabi National Exhibition Company (ADNEC) |
ADNEC |
Reinstatement of parking areas, landscaping
works, laying of decorative gravel, kerbstones and interlocking tiles. |
1.45 |
07/01/2012 04/02/2012 |
37.
AD497 |
P132
– Saadiyat Beach Access: Civil and Landscape
works |
Tourism
Development and Investment Company (TDIC) |
Parsons
International Ltd |
Design and Build of Saadiyat
Public Beach Access Road and Landscape works – All works in accordance
with the Statutory Authorities requirements. 1km Dual carriageway, parking, street
lighting, irrigation and storm water networks. |
7.93 |
12/03/2012 10/06/2012 |
38.
AD499 |
Terminal
3 (T3) Early Site works construction – Contract No. AUH.06.12.0455 |
Abu
Dhabi Airports Company |
Ghafari
Associates LLC |
Modification of Airside operation area
fence and construction of new temporary Wire fence, Cut, Fill and Compact in
layers for proposed Bus Gate building and Transfer Baggage facilities. |
20.79 |
01/08/2012 15/08/2013 |
39.
AD500 |
Saadiyat
Beach Villas Ph.1
Roads and Miscellaneous works package |
TDIC |
Parsons
International |
Roads and miscellaneous works package at
Areas SB12, SB13, SB14, SB15 and SB16.
Supply & Lay of Asphalt Wearing Course, Install street lighting,
Supply & install Potable water and irrigation networks. External paving for Guard Houses. |
11.03 |
08/05/2012 29/12/2012 |
40.
AD501 |
Al
Ain Wildlife Park & Resort Site wide
Infra-structure Phase 1 |
Al
Ain Zoo & Aquarium Public Institution |
Hyder
Consulting Middle East |
Preliminary and General Management services
plus various building and civil works for site-wide Infrastructure
and Utilities to be executed through various Task Orders. |
214.26 |
22/05/2012 21/05/2014 |
41.
AD505 |
The
Expansion of A.D. International Airport – Support Facilities:
South
Airfield Development & Rehabilitation Construction Package 2. |
Abu
Dhabi Airport Company (ADAC) |
Jacobs
International Holdings Inc. (Jacobs) |
Extension of Taxiway network with 2.5km
parallel Taxiways plus connecting taxiways.
100,000 m2 of Apron slabs for cargo area.
Networks for Fire Fighting, Electrical
distribution, communications, airfield ground lights, storm drainage system.
Airside roads and fencing.
Main Jet Fuel system, 20000m of Jet Fuel
lines with fuel hydrants.
Remediation works on the existing taxiway
F. |
536.02 |
23/07/2013 14/01/2015 |
42.
AD506 |
Sir
Bani Yas Island Central
Development Zone – Looping and Separation of Irrigation Ring Main
– Contract No. P042-C43 |
Tourism
Development and Investment Company (TDIC) |
Parsons
International Ltd. |
Looping of irrigation ring main 630mm dia HDPE pipes, Fittings, Valves and Chambers, and Tie-in
to existing Ring Main and other related works. Disinfection and hydro-testing of
existing DN300 pipeline, connection to existing DN300 D.I. potable water
pipe. |
14.50 |
18/06/2013 05/08/2014 |
43.
AD508 |
Earthworks
and Road
works
Project
10019 Sweihan Airbase
Contract No. MW-OU-080-2010 |
Command
of Military Works/Kier Construction LLC |
WS
Atkins & Partners |
Construction of Earth-works, Road works,
Car Parking, Truck Parking etc in Security Zones at
Sweihan Airbase. |
36.39 |
10/09/2013 15/02/2014 |
44.
AD511 |
Baniyas
Residential
Development (411 Villas) Road and Utilities Infrastructure works |
Ministry
of Presidential Affairs represented by Engineer’s Office, Dubai |
KEO
International Consultants |
Construction of Roads & Infrastructure
works for 411 Villas at Baniyas Residential
Development (Abu Dhabi West) comprising Potable Water/Fire Water network,
Sewerage and Storm water drainage networks, Irrigation
network
including
1 No. Pumping
Station, Telecommunication system, Power distribution network,
3 No. Substations, Street Lighting and
Landscaping, Hardscaping and Roads. |
205.59 |
13/10/2013 12/01/2015 |
45.
AD520 |
SB-02 Saadiyat Beach Villas Infrastructure works - Contract No.P137-C01. |
Tourism Development & Investment Company |
Parsons International Ltd |
Infrastructure Main Contract works for SB02 Saadiyat Beach Villas, Saadiyat Island project for 28 No. Plots including 1 No. 22KV Electrical Substation.. |
24.58 |
|
46.
AD521 |
Road, Infrastructure and Public Realm for Sector E-25 - Phase 1 |
Abu Dhabi City Municipality |
AECOM / Hyder Consulting |
Construction of New Roadways, Parking areas, Side walks, Storm Water Drainage, Sewerage Network, Water Supply Network, Power Supply Network, Road Lighting, Telecommunication Network, Utility Relocation and/or Protection, Landscape works and other related construction. |
|
|
47.
AD532 |
Internal Roads and Infrastructure for the New Residential Lands in Al Maqtaa Channel in Abu Dhabi
|
Abu Dhabi City Municipality
|
AECOM
|
General Site Clearance, Site Establishment, Removal of Trees as per PRFD requirements, Demolition of Distributor Carriageway and Footpaths, Setting up Diversion, Removal/ Diversion and Protection of Existing Services, Construction of Main Carriageway and Internal Service Roads, Construction of Marine works, Utility Services comprising Storm Water Drainage, Carriageway Lighting, Electrical Power, Sewerage Works, Water Network, Irrigation Network and Telecommunication Services within the limit of the Contract.
|
112.41 |
|
48.
AD540
|
Infrastructure & Public Realm, Car Park ‘Shell & Core’ and Boat storage Facility, Construction works in connection with Yas South Development.
|
Miral Asset Management LLC
|
KBR/ Hyder Consulting Middle East
|
"Construction Of Roads. Infrastructure And Public Realm of the Yas South Development, Shell And Core of 3 Level Integrated Destination Resort Car Park, Ramps & Tunnel (Provisional), Rock Revetment and Marine Works and Yas Marina Boat Storage Facilities.
Yas South Infrastructure Comprising 610,000 M3 Earth Works, 10 Km Road Works, 9.6 Km Potable Water Line, 6 Km Irrigation Line With 3000 M3 Irrigation Reservoir and Pumping Station, 14 Km Storm Water Line With 3 No. Sea Front Outfall, 6 Km Sewer Line, 16 Km 22kv Power Network With 6 No. 22kv Substation, 14 Km Lv Cabling, 157 No. of Decorative Street Light Poles With 9 Km Street Light Cables, 10 Km Of Telecommunication Ducts, 7 Km Gas Networks, 825m of 6 No. Vehicular Underground Ramp/ Tunnel (Provisional), Soft Landscaping for 20 No. Public Parks."
|
|
|
49. AD533 |
MRHE-22 HTA: Infrastructure Works for 346 Villas at Makan, Hatta, U.A.E. |
Mohammed Bin Rashid Housing Est. |
Jouzy Consulting Engineers |
Construction of Infrastructue works for 346 Villas,
Design and Build Sewerage Treatment Plant and
all other associated Utility Works |
113.98 |
24/03/2016 31/01/2018 |
50. AD534 |
Phase 1 Utility Works for Tawazun Industrial Park in Al Ajban, Abu Dhabi
RFP: TIP/PED2085/CPD/ADZ/15 |
Tawazun Industrial Park (TIP) |
Parsons International Ltd |
Potable Water Network: 15,767 LM HDPE (160mm - 400 mm) including 79 No. Valve Chambers. |
64.85 |
03/04/2016 30/11/2017 |
51. AD537 |
Al Forsan Sewage and TSE Connections. |
Al Forsan Real Estate |
WS Atkins & Partners |
Construction of 1100 Lm of 500 mm dia GRP Sewer connection to Al Forsan Hotel with new Lifting Station and modification of existing Lifting Station and Construction of 1425 Lm of 300 mm dia GRP TSE connection for Al Forsan Development and Central Cooling Plant with 2000 M3 TSE Reservoir and Pumping station. |
17.93 |
12/09/2016 18/01/2018 |
52. AD542 |
Project AQUA |
Miral Asset Management LLC |
AECOM |
Corniche Beach Revitalization for recreational purpose by constructing entertainment facilities, air-conditioned pavilion with restaurant and café, various outdoor F & B outlets, shaded structure, water fountain, toilet blocks, refurbishment of underpass, soft landscaping, hardscaping and all associated infrastructure and earth works. |
51.91 |
13/08/2017 30/09/2018 |
53. AD543 |
R1065-Internal Roads & Mohamed Bin Rashid Housing Establishment in Hatta. |
Roads & Transport Authority |
Jouzy Consulting Engineers |
Pavement works, Tiling works, 8 Km of Road works and Street lighting works |
29.94 |
25/12/2017 12/07/2018 |
54. AD544 |
Yas Island - West Yas Infrastructure Works Supply & Laying of Asphalt |
Athena Emirates LLC - J & P |
- |
Supply, Laying and Testing of Concrete as per ADM Standards of Asphalt Concrete Type II.Supply and spraying of Tack Coat. |
9.64 |
24/06/2018 23/07/2019 |
55. AD545 |
Construction of Phase 2 Roads & Utilities |
MASDAR |
Keo International |
Construction of 1600M of Road Works including Water supply, Fire Hydrants, Storm water, Telecom, Solar Power Street Lighting, Irrigation, District Cooling and Soft Landscaping Works |
71.51 |
24/06/2018 23/07/2019 |
56. AD546 |
Kart Zone Development Project – Yas Marina. |
Abu Dhabi Motor Sports Management |
- |
Demolish and clear out the scope area of existing Kart Zone and Re-establish new Karting area with Asphalt laying as per the new Karting Layout. |
17.15 |
01/08/2018 31/10/2018 |
57. AD547 |
Project Windsor - The Presidential Palace, Abu Dhabi, Visitor’s Car Park, Public Park & ELSS Colonnade Works |
Miral Asset Management LLC |
Jones Lang LaSalle |
Visitor Car Park: Construction of 49,000M2 interlocking tile car park and modification of existing road with roundabout including all associated infrastructure.
Public Park: Modification of existing surface with 12,150 M2 of porcelain tiling, 4,300 M2 of granite tiling and associated works.
Colonnade Arcade: Construction of projector room on the existing 2 no. colonnades. |
59.52 |
26/08/2018 28/02/2019 |
58. AD548 |
Yas Marina Parking - Yas Island |
Miral Asset Management LLC |
KBR/ ARCADIS/ Currie & Brown |
Modification of existing Car Parking to increase the facility by additional Parking Bays including Modification of the Associated Services. |
2.18 |
16/08/2018 18/11/2018 |
59. AD549 |
Design and Build of the Central Park at MASDAR City, Phase 1 |
MASDAR |
Keo International LTD |
Design and Build Iconic Public Realm Destination with Construction of 26,000 m2 Soft Landscape, Hardscape, Public Realm Iconic Pavilion with Vertical Gardens and Solar Power Panel Walkway. |
45.51 |
31.12.2018 31/07/2019 |
60. AD559 |
Saadiyat Island Cultural District Remaining Infrastructure and Lagoons Arterial Road |
Aldar Projects PJSC |
Parsons, Arcadis |
Infrastructure and Public Realm Construction Works |
107.7 |
21/02/2021 - |