1. AD401 |
Development of Camel
Race Tracks at Ras Al Khaimah
and Umm Al Quwain |
Al Ain
Municipality |
Freeman Fox
International |
Earth works and Structures |
27.67 |
04/07/1993 02/11/1993 |
2. AD411a |
Test Asab Gas Development Project - Phase I and II |
Snamprogetti
/Granite Construction Company |
Sir Alexander Gibb and
Partners |
Earth works plus Sand Levelling / Filling for New Gas Plant as
well as Road works and Hard Standings at Gas Plant area. |
24.96 |
01/01/1998 30/04/2000 |
3. AD433a |
Earth filling,
Levelling and Access Roads at Al Jabeeb, Shawamekh, Al Reef Hiliya and
Al Falah. |
WD filling Section |
AlSweidi |
Earth filling, levelling, Farm Access Roads, Hard standings and
Sand levelling works |
32.50 |
01/08/2001 15/03/2002 |
4. AD427 |
Water Tank Mounts at Seih Al Sidirah (Ashoosh) |
Al Ain
Municipality/Pauling M.E |
Diwi
Consult |
7 No. Earthen Platforms 120,000 m3 each dressed with stone Rip
Rap and Asphalt Access Roads |
9.50 |
21/07/2001 25/03/2002 |
5. AD424 |
Ajban
Tree Plantation |
Works Department |
AlSweidi |
Transport sweet sand and spread & level in designated areas |
9.15 |
01/03/2001 |
6. AD435 |
Filling at Al Dhafrah air Base Zone 1B Contract MW-241-2001 |
Directorate of
Military Works |
Stanley Consultants |
General Filling and Earthworks formation for Runway &
Taxiways |
29.95 |
06/05/2002 25/12/2002 |
7. AD444 |
Unleaded Gasoline/Low Sulphur Gas Oil Refinery at Ruwais
- Site Preparation Works |
Granite/Technip - Colflexip |
Technip-Coflexip
/Takreer |
General Levelling and Platform Preparation for the N ew Refinery |
8.55 |
15/11/2002 |
8. AD493 |
Amiri
Flight Package 1 - Advance Earth Works |
Amiri
Flight |
Halcrow
International |
Extension of Aprons at Amiri Flight
800 M2 Cut/Fill Formation of 450,000 M3 General Imported Fill 250000 M3,
Minor Fencing And Access Roads |
11.81 |
07/10/2002 30/03/2003 |
9. AD441 |
Shuweihat
Water Transmission Scheme - Lot B Pipeline Earthwork |
Marubeni/Taisei
Corporation |
Tebodin
Middle East Ltd |
Construction of Earth Bund for Pipes with adjacent Access Roads
Approx. 6,000,000 M3 Excavation of Pipe Trench 120 km for 2 No. 1.6M Dia |
137.60 |
01/01/2003 31/05/2004 |
10. AD453 |
ADWEA Contract No. N
2257 - Interconnection of ADCO / TRANSCO Power Networks Lot 2 Overhead Lines 400
KV and 220 KV Overhead Transmission Lines Access Road/Platform works |
ADWEA / KEC
International Limited |
Lahmeyer
International |
Construction of |
9.71 |
31/12/2004 13/11/2005 |
11. AD459 |
ADISC Residential,
Leisure and Commercial Compound Enabling Works |
Private Property
Management |
Private Property
Management |
Unclassified Excavation, Load Bearing Filling for Roads and Non
Load Bearing General Filling and other associated works. |
8.50 |
07/07/2007 07/09/2007 |
12. AD464 |
Paris- Sorbonne
University |
Al Habtoor-Murray
& Roberts Joint Venture |
Parsons International
Ltd |
Excavation, Ground preparation and Structural Backfill including
material testing and monitoring by PBT's and CPT's for building construction
platform. |
25.00 |
22/05/2008 30/09/2008 |
13. AD487c |
P030 Zayed National Museum - Package C06: Construction of
Remote Service Facility and Main Building Substructure works. |
Al Habtoor-Murray
& Roberts JV |
WSP |
Structural Earthworks and Drainage Works for Enabling Works to
Sub Structures |
5.00 |
20/01/2011 |
14.AD426 |
Al Raha
Sand Filling
|
Works Dept. |
Works Dept. |
Import
Red Sand and Spread/level in designated areas.
|
1.00 |
23/05/2001
13/06/2001 |
15.AD430 |
Miscellaneous Filling Works |
Works Dept
(Filling Section) |
DiwiConsult |
Various
earth filling, leveling and haulage jobs issued through work orders in Abu
Dhabi vicinity within 100 km radius |
30.00
(approx.) |
22/06/2002 21/06/2003 |
16. AD441 |
Shweihat
Water Transmission Scheme – Lot B Pipeline
Earthwork |
Marubeni/Taisi Corporation |
TebodinMiddle East Ltd. |
Construction
of Earth Bund for Pipes with adjacent Access Roads approx..
6,000,000 m3 Excavation of Pipe Trench 120 km for 2 No. 1.6m dia. |
137.60 |
01/06/2003 31/05/2004 |
17. AD443 |
AmiriFlight Package 1 – Advance Earthworks |
AmiriFlight |
HalcrowInternational |
Extension
of Aprons at Amiri Flight 800 sqm
Cut/Fill formation of 450,000 m3 general imported fill 250,000 m3, minor
fencing and access roads. |
11.81 |
07/10/2002 30/03/2003 |
18.AD499a |
Expansion of the Abu Dhabi
International Airport – Capacity Enhancement Programme
: Earthworks for Building Pad |
ALEC |
Ghalari |
Earthworks
for US Customs & Border Protection (CBP)
Facility at
Terminal 3 Abu Dhabi
International Airport . |
4.85 |
01/08/2012 31/12/2012 |
19. AD536 |
Enabling Works for North Al Wathba Zone 1 |
Abu Dhabi Services PJSC trading as MUSANADAt |
WS Atkins & Partners |
Enabling Works for the development of north Al Wathba Infrastructure Zone 1 for 889 hectares of land with 8.50 million M3 of Earth works cut and fill, Demolition of existing building, Diversion of Electrical Cable and Telecommunication Lines. |
79.95 |
11/08/2016 17/09/2017 |