Code |
Project Name |
Client |
Consultant |
Type of Work |
Amount
(MN DHS) |
| AD404 |
Rehabilitation & Widening of Abu Dhabi - Dubai Road, Contract No. 2 |
Public
Works Dept. Abu Dhabi |
Parkman
Consultants Limited |
18 km of
4Lane Highway and 1 Interchange (Al Reef Palace) |
160.74 |
| AD408 |
Al
Muqatara/Himeem Road (Sahil Road) Contract No. 3 |
Public
Works Dept. Abu Dhabi |
Sir
Alexander Gibb and Partners |
47 km Road
works and 2 Underpasses |
135.89 |
|
AD446 |
Construction of North East Abu Dhabi Phase I Development Infrastructure
Package |
Abu Dhabi
Company for Onshore Oil Operations (ADCO) |
ADCO |
54 km of
Single Carriage Roads in Dabbiya area including 3 km of Causeways with
concrete multicell culverts joining upto 4 No. adjacent islands. |
129.90 |
| AD412 |
New Road
Tarif - Madinet Zayed - Liwa Contract 1B |
Public
Works Dept. Abu Dhabi |
Ove Arup &
Partners International |
24 km Dual
Carriageway and 3No. Underpasses, and 5 No. Oil & Gas Pipeline Culverts |
127.12 |
| AD403 |
Internal
Roads for 300 Low Cost Houses in Wadi Flaie |
Public
Works Dept. Abu Dhabi |
Freeman Fox
International |
Township
development Roads, Footpaths, Utilities, Sewer Networks and STP |
113.97 |
| AD429 |
Sheikh
Zayed Bridge Contract No. 2 |
Works
Department |
Rendel
Palmer & Tritton |
290m Long
(5 Span) Twin Bridge with Prestressed Concrete Voided Deck slab and 300m
Long 6 Span single Bridge with Prestressed Concrete voided Deck Slab,
Widening/ Reconstruction of approach roads and associated utilities work |
107.20 |
| AD441 |
Shuweihat
Water Transmission Scheme - Lot B Pipeline Earthwork |
Marubeni/Taisei Corporation |
Tebodin
Middle East Ltd |
Construction of Earth Bund for Pipes with adjacent Access Roads Approx.
6,000,000 M3 Excavation of Pipe Trench 120 km for 2 No. 1.6M Dia |
89.50 |
| AD405 |
Internal
Roads for 200 Low Cost Houses in Al Quo'A |
Public
Works Dept. Abu Dhabi |
Freeman Fox
International |
Township
development Roads, Footpaths, Utilities, Sewer Networks and STP |
87.91 |
| AD414 |
Breakwater
Developments Contract No 987 |
Abu Dhabi
Municipality |
DeLeuw
Cather International Ltd |
4-Lane Dual
Carriageway, 3-Span Bridge, Car Parks and Utilities |
76.84 |
| AD409 |
Internal
Roads for 100 Low Cost Houses in Al Waqan |
Public
Works Dept. Abu Dhabi |
Freeman Fox
International |
Township
development Roads, Footpaths, Utilities, Sewer Networks and STP |
76.36 |
| AD431 |
Internal
Roads for 200 Low Cost Houses at Al Shawamekh |
Works
Department |
Frederic R.
Harris |
Dual
Carriageway 4 km Internal Roads 14 km Sewer Network 16 km Power and
Water Distribution Network |
75.00 |
| AD445 |
Construction of Bridge at Officers City and between Two Bridges City
Contract 999 |
Abu Dhabi
Municipality |
Frederic R
Harris Inc |
Construction of an Underpass Dual Carriageway traversing the Mussafah
Road/Abu Dhabi International Airport Expressway, and a steel arch bridge
over the recreational canal between the City between 2 bridges & Police
Officers City |
54.52 |
| AD407 |
Bridge over
Truck Road between ME11 & ME12 at Mussafah |
Abu Dhabi
Municipality |
Freeman Fox
International |
Bridge work
and Link Roads, and 7 No. Gas Pipeline Culverts |
53.00 |
| AD418 |
Chain Link
Fence for Boundary Line Contract No MW/2215 |
Directorate
of Military Works |
Directorate
of Military Works |
Gatch Road
along Oman UAE Border and Supply & Install Fence from Al Ain to Umm
Zumool |
43.52 |
| AD438 |
Trip
Project No 997 East road Widening IP43A to IP145 |
Abu Dhabi
Municipality |
De Leuw
Cather International |
Total
Length of Project Road 9Km widening by Adding one New Lane to each
Carriageway plus Provision of New U-Turns, Free Right Turns and
Modification of Utilities |
43.05 |
| AD434 |
Maintenance
of Roads in Al Ain Region |
Al Ain
Municipality |
WS Atkins &
Partners Overseas |
Repair of
Roads,Construcion of Storm water Drainage and Repair of Concrete Bridges |
40.00 |
| AD448 |
Conference
Palace Hotel External Works, Package BP 14A & B |
Arabian
Construction Co. |
Turner
Construction International |
External
works for Utilities of Conference Palace Hotel (Sanitary Drainage, Storm
Water, Irrigation, Fire Fighting and Water Supply) with related Parking
for Road works activities. |
37.00 |
| AD435 |
Filling at
Al Dhafrah air Base Zone 1B Contract MW-241-2001 |
Directorate
of Military Works |
Stanley
Consultants |
General
Filling and Earthworks formation for Runway & Taxiways |
29.95 |
| AD433A |
Earth
Filling & Levelling at Shawamekh, Al Reef Hiliya and Al Falah |
WD filling
Section |
Al Sweidi |
Cut/Fill,
Levelling plus Importation of fill, and Levelling approximately
6,000,000 m³ |
26.50 |
| AD452 |
Al Wathba
Camel Race Track - Abu Dhabi |
Crown
Prince (Pvt) Management |
WS Atkins |
Maintenance
and realignment of the existing Camel Race Track and Construction of New
Camel Race Track with Grand Stand in Al Wathba |
26.49 |
| AD436 |
Al Raha
Beach Resort - Abu Dhabi Marine Works |
Al Habtoor
for Private Department |
DMJM/TEST |
Land
Reclamation, Construction of Sea Wall, Reshaping Sea Bottom to form
Beach and Creation of 2 No. Artificial Island, Construction of New
Breakwater and Create small craft Marian and Slipway |
20.00 |
| |
|
|
|
|
|